泰索二号发电厂

挪威 / 水电 / Power plant

泰索二号发电厂 is located beside Lake Ringedalsvannet in the Tysse Valley in Odda Municipality, Vestland县.

  • 1967
    投入使用
  • 220 MW
    装机容量
  • 1033妇女和
    年生产

The power plant makes use of a height of fall of 735 metres from the nearby Hardangervidda plateau. Establishment of the plant led to the development of the waterfalls Ringedalsfossen and Tyssestrengene with their 300 metres of free fall.

The tunnel that transfers operating water to Tysso II goes around Lake Ringedalsvannet, which is located at about 1,150 metres above sea level. The tunnel is over 15 km long and has a cross section of between 16 and 18 square metres.

The power plant was commissioned in 1967 and is a partially submerged plant, i.e. part of it is located at a level below the outlet. The power plant has two Pelton turbines, each producing 110 MW. The power plant discharges into Lake Ringedalsvannet, which is the reservoir for Oksla power plant.

泰索二号发电厂 is currently leased to Aktieselskapet Tyssefaldene AS (AST), which is also responsible for daily operations.

十大最好的网赌平台拥有60个.71岁的美国人占17%.4 per cent of the power rights. DNN Industrier owns the other 39.83%和28%.6 per cent of the power rights.

 

公司 所有权份额
十大最好的网赌平台 100%
  • 泰索二号发电厂
    Tysso
    十大最好的网赌平台

    The entry portal at 泰索二号发电厂

  • 泰索二号发电厂
    Tysso
    十大最好的网赌平台

    The entry portal at 泰索二号发电厂

  • The machine hall with two turbines.
    Tysso
    十大最好的网赌平台

    The machine hall with two turbines.

  • The machine hall with two turbines.
    Tysso
    十大最好的网赌平台

    The machine hall with two turbines.

  • 泰索二号发电厂
    Tysso
    十大最好的网赌平台

    The outflow from the power plant.

  • 泰索二号发电厂
    Tysso
    十大最好的网赌平台

    The outflow from the power plant.

  •  Illustration of 泰索二号发电厂
    Tysso
    NVIM

    To see the illustration in larger format, click the link below the text.

  • Illustration of 泰索二号发电厂
    Tysso
    NVIM

    To see the illustration in larger format, click the link below the text.

Find out more about our activities in 挪威